Skip to content
The Bengaluru Live | Bengaluru News, Breaking Updates

The Bengaluru Live | Bengaluru News, Breaking Updates

Bengaluru’s Leading News Portal

bmc-ad
Primary Menu
  • HOME
  • Bengaluru
  • Karnataka
  • POLITICS
  • CRIME
  • Delhi
  • Kannada News
  • Hindi News
  • MORE NEWS
    • Supreme Court
    • CITY UPDATES
    • PM
    • SPORTS
    • STATE
    • EDUCATION
    • ENTERTAINMENT
    • HEALTH
    • Real Estate
    • SPORTS
    • CORONA
    • MOBILITY/TRANSPORT
    • Horoscope
  • Home
  • CITY UPDATES
  • Kupup-Sherathang Road in Sikkim, 74 other projects dedicated to nation
  • CITY UPDATES
  • STATE

Kupup-Sherathang Road in Sikkim, 74 other projects dedicated to nation

12 October 2024 3 minutes read
0
đŸ“˜ Read this story in Kannada

New Delhi, Oct 12 (PTI) Defence Minister Rajnath Singh on Saturday dedicated inaugurated the Kupup-Sherathang Road in Sikkim and 74 other infrastructure projects of the Border Roads Organisation (BRO) built at a cost of Rs 2,236 crore.

Singh inaugurated the projects virtually from the headquarters of the Trishakti Corps at Sukna in West Bengal.

The defence minister termed the projects a testament to the government’s unwavering resolve to keep strengthening the border infrastructure and ensuring socioeconomic progress of these areas.

These projects will go a long way in enhancing the country’s defence preparedness, he said, adding, Prime Minister Narendra Modi’s vision of ‘Viksit Bharat by 2047’ can be realised through such infrastructure projects.

These 75 BRO infrastructure projects — 22 roads, 51 bridges and two others — spread across 11 states and union territories have been built at a cost of Rs 2,236 crore, the defence ministry said in a statement.

Nineteen of these projects are in Jammu & Kashmir, 18 in Arunachal Pradesh, 11 in Ladakh, nine in Uttarakhand, six in Sikkim, five in Himachal Pradesh, two each in West Bengal and Rajasthan and one each in Nagaland, Mizoram and Andaman & Nicobar Islands.

One of the main highlights was the inauguration of the Kupup-Sherathang Road in Sikkim which serves as a crucial link between Jawahar Lal Nehru Marg and Zuluk axis, the ministry said in a statement.

With the inauguration of these 75 projects, the BRO has completed a total of 111 infrastructure projects in 2024 at an overall cost of Rs 3,751 crore, it said.

This includes 36 projects worth Rs 1,508 crore, such as the state-of-the-art Sela Tunnel in Arunachal Pradesh, inaugurated by Prime Minister Narendra Modi earlier this year.

Last year, 125 BRO infrastructure projects were dedicated to the nation at a cost of Rs 3,611 crore, the statement added.

Singh commended the grit and determination of the BRO personnel for completing the projects in a time-bound manner even in most challenging terrains and harsh weather conditions, adding that the government, in its third term, aims to further bolster the border infrastructure with “more promptness”.

Referring to the increased allocation of Rs 6,500 crore for the BRO in the Union Budget 2024-25, he expressed hope that it would not only contribute to strategic infrastructure development, but also prove helpful in the socioeconomic progress in the border areas, including the North East region.

He said that governments before 2014 were of the view that the development of border areas “can have an adverse impact as it may be used by the country’s adversaries”.

Singh emphasised that border infrastructure development has been the priority area of the PM Modi-led government ever since it came to power as these regions, especially the North East, and are crucial from the socio-economic and strategic perspectives.

“In the last decade, we have built a vast network of roads from villages to cities, which has resulted in the country witnessing progress at an unprecedented pace,” he said.

Singh assured the people that new dimensions will be added to the development of border areas, and India will be one of the safest and strongest nations in the times to come.

Chief of the Army Staff Gen Upendra Dwivedi, Defence Secretary-designate R K Singh, Eastern Command’s General Officer Commanding-in-Chief Lt Gen Ram Chander Tiwari, Border Roads DG Lt Gen Raghu Srinivasan, Trishakti Corps General Officer Commanding Lt Gen Zubin A Minwalla were present during the virtual inauguration, while Sikkim Chief Minister Prem Singh Tamang was at the main site in Sherathang. PTI KND TIR TIR

About the Author

View All Posts

Post navigation

Previous: Odisha govt to take measures to make Cuttack a smart city: Majhi
Next: Delhi govt identifies multiple sites for Durga idol immersion

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Related Stories

Bengaluru Pink Line’s 7.5-Km Kalena Agrahara-Tavarekere Stretch Ready; Inauguration Expected in September
  • Bengaluru
  • CITY UPDATES
  • Traffic

Bengaluru Pink Line’s 7.5-Km Kalena Agrahara-Tavarekere Stretch Ready; Inauguration Expected in September

Atul Chaturvedi 2 September 2026
KEA Announces DCET 2026 Second-Round Seat Allotment Schedule; Option Entry Open Until September 5
  • Bengaluru
  • CITY UPDATES

KEA Announces DCET 2026 Second-Round Seat Allotment Schedule; Option Entry Open Until September 5

The Bengaluru Live 2 September 2026
Carver Aviation Eyes Flying Training Academy at Vijayapura Airport, Seeks 2.5 Acres: MB Patil
  • Bengaluru
  • CITY UPDATES
  • Government

Carver Aviation Eyes Flying Training Academy at Vijayapura Airport, Seeks 2.5 Acres: MB Patil

The Bengaluru Live 2 September 2026

Latest Post

Aero India 2027 to Be Held in Bengaluru From February 8-12; Exhibitor Registration Opens September 3 Aero India 2027 to Be Held in Bengaluru From February 8-12; Exhibitor Registration Opens September 3
  • Government
  • Bengaluru

Aero India 2027 to Be Held in Bengaluru From February 8-12; Exhibitor Registration Opens September 3

2 September 2026
Bengaluru Pink Line’s 7.5-Km Kalena Agrahara-Tavarekere Stretch Ready; Inauguration Expected in September Bengaluru Pink Line’s 7.5-Km Kalena Agrahara-Tavarekere Stretch Ready; Inauguration Expected in September
  • Bengaluru
  • CITY UPDATES
  • Traffic

Bengaluru Pink Line’s 7.5-Km Kalena Agrahara-Tavarekere Stretch Ready; Inauguration Expected in September

2 September 2026
KEA Announces DCET 2026 Second-Round Seat Allotment Schedule; Option Entry Open Until September 5 KEA Announces DCET 2026 Second-Round Seat Allotment Schedule; Option Entry Open Until September 5
  • Bengaluru
  • CITY UPDATES

KEA Announces DCET 2026 Second-Round Seat Allotment Schedule; Option Entry Open Until September 5

2 September 2026
Carver Aviation Eyes Flying Training Academy at Vijayapura Airport, Seeks 2.5 Acres: MB Patil Carver Aviation Eyes Flying Training Academy at Vijayapura Airport, Seeks 2.5 Acres: MB Patil
  • Bengaluru
  • CITY UPDATES
  • Government

Carver Aviation Eyes Flying Training Academy at Vijayapura Airport, Seeks 2.5 Acres: MB Patil

2 September 2026
Bengaluru South City Corporation Orders Action on Commercial Use of Basements, Encroachments and Stormwater Drains Bengaluru South City Corporation Orders Action on Commercial Use of Basements, Encroachments and Stormwater Drains
  • Bengaluru
  • CITY UPDATES

Bengaluru South City Corporation Orders Action on Commercial Use of Basements, Encroachments and Stormwater Drains

2 September 2026
Indian Army Recruitment Rally in Vijaypura From September 10-22; ARO Mangalore Issues Candidate Advisory Indian Army Recruitment Rally in Vijaypura From September 10-22; ARO Mangalore Issues Candidate Advisory
  • Bengaluru
  • CITY UPDATES

Indian Army Recruitment Rally in Vijaypura From September 10-22; ARO Mangalore Issues Candidate Advisory

2 September 2026

You may have missed

Aero India 2027 to Be Held in Bengaluru From February 8-12; Exhibitor Registration Opens September 3
  • Government
  • Bengaluru

Aero India 2027 to Be Held in Bengaluru From February 8-12; Exhibitor Registration Opens September 3

Satya Prakash Chaubey 2 September 2026
Bengaluru Pink Line’s 7.5-Km Kalena Agrahara-Tavarekere Stretch Ready; Inauguration Expected in September
  • Bengaluru
  • CITY UPDATES
  • Traffic

Bengaluru Pink Line’s 7.5-Km Kalena Agrahara-Tavarekere Stretch Ready; Inauguration Expected in September

Atul Chaturvedi 2 September 2026
KEA Announces DCET 2026 Second-Round Seat Allotment Schedule; Option Entry Open Until September 5
  • Bengaluru
  • CITY UPDATES

KEA Announces DCET 2026 Second-Round Seat Allotment Schedule; Option Entry Open Until September 5

The Bengaluru Live 2 September 2026
Carver Aviation Eyes Flying Training Academy at Vijayapura Airport, Seeks 2.5 Acres: MB Patil
  • Bengaluru
  • CITY UPDATES
  • Government

Carver Aviation Eyes Flying Training Academy at Vijayapura Airport, Seeks 2.5 Acres: MB Patil

The Bengaluru Live 2 September 2026

About us

The Bengaluru Live is one of the local digital media house which is publishing news in English and in Kannada language. We are also one of the largest local news providers on the internet through our news websites.

Useful Links

  • Advertise with us
  • Contact us
  • Privacy Policy

Recent News

  • Aero India 2027 to Be Held in Bengaluru From February 8-12; Exhibitor Registration Opens September 3
  • Bengaluru Pink Line’s 7.5-Km Kalena Agrahara-Tavarekere Stretch Ready; Inauguration Expected in September
  • KEA Announces DCET 2026 Second-Round Seat Allotment Schedule; Option Entry Open Until September 5
  • Carver Aviation Eyes Flying Training Academy at Vijayapura Airport, Seeks 2.5 Acres: MB Patil
©Copyright 2026 The Bengaluru Live All rights reserved. | MoreNews by AF themes.