Skip to content
The Bengaluru Live | Bengaluru News, Breaking Updates

The Bengaluru Live | Bengaluru News, Breaking Updates

Bengaluru’s Leading News Portal

bmc-ad
Primary Menu
  • HOME
  • Bengaluru
  • Karnataka
  • POLITICS
  • CRIME
  • Delhi
  • Kannada News
  • Hindi News
  • MORE NEWS
    • Supreme Court
    • CITY UPDATES
    • PM
    • SPORTS
    • STATE
    • EDUCATION
    • ENTERTAINMENT
    • HEALTH
    • Real Estate
    • SPORTS
    • CORONA
    • MOBILITY/TRANSPORT
    • Horoscope
  • Home
  • CITY UPDATES
  • Bullet train project: Bridge over Kolak river completed, nine out of 24 bridges on route constructed
  • CITY UPDATES
  • STATE

Bullet train project: Bridge over Kolak river completed, nine out of 24 bridges on route constructed

16 July 2024 3 minutes read
0
đŸ“˜ Read this story in Kannada

Ahmedabad, Jul 16 (PTI) The National High-Speed Rail Corporation Limited (NHSRCL) has finished constructing a 160-metre bridge over the Kolak river in Gujarat’s Valsad district as part of the Ahmedabad-Mumbai bullet train project, an official said on Tuesday.

With this, nine out of 24 river bridges on the 508-km corridor have been completed, the NHRCL said in its latest update.

The bridge between Vapi and Bilimora stations comprises four full-span girders of 40 meters each, it said.

Kolak River is seven kilometres from Vapi and 43 km from Bilimora railway stations. The river originates from Saputara hills near Valveri and meets the Arabian Sea, the NHSRCL said.

According to the NHSRCL, bridges have been constructed on the rivers Par and Auranga in Valsad, Purna, Mindhola, Ambika and Venganiya in Navsari, Mohar in Kheda and Dhadhar in Vadodara district.

Bridge construction on Narmada, Tapti, Mahi and Sabarmati rivers was underway, it said.

The Mumbai-Ahmedabad bullet train corridor will have 12 stations on its 508-km route, of which eight will be in Gujarat and four in Maharashtra.

Stations will come up at Sabarmati, Ahmedabad, Anand, Vadodara, Bharuch, Surat, Bilimora and Vapi in Gujarat, and Boisar, Virar, Thane and Mumbai in Maharashtra.

The NHSRCL said the construction of stations was progressing rapidly, with the foundation work on all eight stations in Gujarat completed and the construction of superstructures at an advanced stage.

The stations will have modern and advanced facilities and amenities for passengers, and some were being developed as transport hubs through integration with all basic modes of transportation, such as autos, buses and taxis, for faster and hassle-free connectivity.

As of July 2, all civil contracts have been awarded, and 190 km of the viaduct and 321 km of pier work were completed, the NHSRCL stated in its update.

The land required for the project has been acquired in Gujarat, Dadra and Nagar Haveli, and Maharashtra.

The first mountain tunnel of 350 metres near Zaroli village in Valsad has been completed, and work has commenced on the country’s first 7-km undersea rail tunnel, which is a part of 21 km long tunnel between BKC and Shilphata in Maharashtra, it said.

The government aims to run the bullet train’s first phase between Surat and Bilimora in south Gujarat by 2026.

Prime Minister Narendra Modi and his Japanese counterpart Shinzo Abe launched the Ahmedabad-Mumbai bullet train project in Gujarat on September 14, 2017.

The 508-km route is expected to be covered in three to three-and-a-half hours.

The high-speed rail line being built using Japan’s Shinkansen technology has been funded by the Japan International Cooperation Agency (JICA). PTI KA PD ARU

About the Author

View All Posts

Post navigation

Previous: State to invest Rs 9,000 cr in construction, renovation of roads in FY25: Raj minister
Next: Pall of gloom descends on Andhra village awaiting soldier’s body

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Related Stories

Hoskote Police Move to Stop 4 AM Biryani Service, Direct Hotels to Open at 6 AM
  • Bengaluru
  • CITY UPDATES
  • CRIME

Hoskote Police Move to Stop 4 AM Biryani Service, Direct Hotels to Open at 6 AM

The Bengaluru Live 23 August 2026
Varamahalakshmi Festival Celebrated Across Bengaluru; Temples, Homes Decked Up for Special Worship
  • Bengaluru
  • CITY UPDATES

Varamahalakshmi Festival Celebrated Across Bengaluru; Temples, Homes Decked Up for Special Worship

Satya Prakash Chaubey 21 August 2026
Karnataka to Prepare Coastal-Malnad Tourism Policy Draft by September 7: K.J. George
  • Bengaluru
  • CITY UPDATES
  • Government

Karnataka to Prepare Coastal-Malnad Tourism Policy Draft by September 7: K.J. George

The Bengaluru Live 21 August 2026

Latest Post

Hoskote Police Move to Stop 4 AM Biryani Service, Direct Hotels to Open at 6 AM Hoskote Police Move to Stop 4 AM Biryani Service, Direct Hotels to Open at 6 AM
  • Bengaluru
  • CITY UPDATES
  • CRIME

Hoskote Police Move to Stop 4 AM Biryani Service, Direct Hotels to Open at 6 AM

23 August 2026
Karnataka CM D K Shivakumar Seeks Chartered Accountants’ Advice to Boost State Revenue, Plug Leakages Karnataka CM D K Shivakumar Seeks Chartered Accountants’ Advice to Boost State Revenue, Plug Leakages
  • Bengaluru

Karnataka CM D K Shivakumar Seeks Chartered Accountants’ Advice to Boost State Revenue, Plug Leakages

21 August 2026
Karnataka Cabinet Clears Premature Release of 28 Life Convicts on Good Conduct; 29 Eligible in Total Parappana Agrahara Bangalore Central Jail
  • CRIME
  • Bengaluru
  • Government

Karnataka Cabinet Clears Premature Release of 28 Life Convicts on Good Conduct; 29 Eligible in Total

21 August 2026
Give Notice, Debate Nagendra Issue in House Instead of Simply Demanding Resignation: Karnataka CM D K Shivakumar Give Notice, Debate Nagendra Issue in House Instead of Simply Demanding Resignation: Karnataka CM D K Shivakumar
  • POLITICS

Give Notice, Debate Nagendra Issue in House Instead of Simply Demanding Resignation: Karnataka CM D K Shivakumar

21 August 2026
Karnataka Launches KEO AI PC, Plans Initial Deployment of 1,000 Devices in Government Schools Karnataka Launches KEO AI PC, Plans Initial Deployment of 1,000 Devices in Government Schools
  • Government
  • Bengaluru

Karnataka Launches KEO AI PC, Plans Initial Deployment of 1,000 Devices in Government Schools

21 August 2026
Varamahalakshmi Festival Celebrated Across Bengaluru; Temples, Homes Decked Up for Special Worship Varamahalakshmi Festival Celebrated Across Bengaluru; Temples, Homes Decked Up for Special Worship
  • Bengaluru
  • CITY UPDATES

Varamahalakshmi Festival Celebrated Across Bengaluru; Temples, Homes Decked Up for Special Worship

21 August 2026

You may have missed

Hoskote Police Move to Stop 4 AM Biryani Service, Direct Hotels to Open at 6 AM
  • Bengaluru
  • CITY UPDATES
  • CRIME

Hoskote Police Move to Stop 4 AM Biryani Service, Direct Hotels to Open at 6 AM

The Bengaluru Live 23 August 2026
Karnataka CM D K Shivakumar Seeks Chartered Accountants’ Advice to Boost State Revenue, Plug Leakages
  • Bengaluru

Karnataka CM D K Shivakumar Seeks Chartered Accountants’ Advice to Boost State Revenue, Plug Leakages

Satya Prakash Chaubey 21 August 2026
Parappana Agrahara Bangalore Central Jail
  • CRIME
  • Bengaluru
  • Government

Karnataka Cabinet Clears Premature Release of 28 Life Convicts on Good Conduct; 29 Eligible in Total

Satya Prakash Chaubey 21 August 2026
Give Notice, Debate Nagendra Issue in House Instead of Simply Demanding Resignation: Karnataka CM D K Shivakumar
  • POLITICS

Give Notice, Debate Nagendra Issue in House Instead of Simply Demanding Resignation: Karnataka CM D K Shivakumar

The Bengaluru Live 21 August 2026

About us

The Bengaluru Live is one of the local digital media house which is publishing news in English and in Kannada language. We are also one of the largest local news providers on the internet through our news websites.

Useful Links

  • Advertise with us
  • Contact us
  • Privacy Policy

Recent News

  • Hoskote Police Move to Stop 4 AM Biryani Service, Direct Hotels to Open at 6 AM
  • Karnataka CM D K Shivakumar Seeks Chartered Accountants’ Advice to Boost State Revenue, Plug Leakages
  • Karnataka Cabinet Clears Premature Release of 28 Life Convicts on Good Conduct; 29 Eligible in Total
  • Give Notice, Debate Nagendra Issue in House Instead of Simply Demanding Resignation: Karnataka CM D K Shivakumar
©Copyright 2026 The Bengaluru Live All rights reserved. | MoreNews by AF themes.