Skip to content
The Bengaluru Live | Bengaluru News, Breaking Updates

The Bengaluru Live | Bengaluru News, Breaking Updates

Bengaluru’s Leading News Portal

bmc-ad
Primary Menu
  • HOME
  • Bengaluru
  • Karnataka
  • POLITICS
  • CRIME
  • Delhi
  • Kannada News
  • Hindi News
  • MORE NEWS
    • Supreme Court
    • CITY UPDATES
    • PM
    • SPORTS
    • STATE
    • EDUCATION
    • ENTERTAINMENT
    • HEALTH
    • Real Estate
    • SPORTS
    • CORONA
    • MOBILITY/TRANSPORT
    • Horoscope
  • Home
  • CITY UPDATES
  • ISRO successfully tests large human-rated solid rocket booster for Gaganyaan mission
  • CITY UPDATES

ISRO successfully tests large human-rated solid rocket booster for Gaganyaan mission

The Bengaluru Live 13 May 2022 3 minutes read
0
ISRO successfully tests large human-rated solid rocket booster for Gaganyaan mission

ISRO successfully tests large human-rated solid rocket booster for Gaganyaan mission

đŸ“˜ Read this story in Kannada

BENGALURU:

The Indian Space Research Organisation on Friday successfully completed the static test of a human-rated solid rocket booster (HS200) for the Gaganyaan programme at Satish Dhawan Space Centre (SDSC) in Sriharikota, Andhra Pradesh.

The HS200 is the human-rated version of the S200 rocket booster of satellite launch vehicle GSLV Mk III, popularly known as LVM3, the Bengaluru-headquartered space agency noted in a statement.

“The successful completion of this test marks a major milestone for the prestigious human space flight mission of ISRO, the Gaganyaan, as the first stage of the launch vehicle is tested for its performance for the full duration,” it said.

The event was witnessed by ISRO Chairman and Secretary in the Department of Space, S Somanath, and Director of Vikram Sarabhai Space Centre (VSSC) S Unnikrishnan Nair along with other ISRO scientists.

https://t.co/NctUbVBBZH

— ISRO (@isro) May 13, 2022

The design and development of the HS200 booster were completed at VSSC, Thiruvananthapuram and propellant casting was completed at SDSC, Sriharikota.

The S200 motor, which is the first stage of the LVM3 launch vehicle intended for launching a 4,000 kg class satellite to the geosynchronous transfer orbit, was configured as a strap-on rocket booster.

Based on the successful launch pedigree of this launch vehicle including the Chandrayaan mission, the LVM3 has been identified as the launcher for the Gaganyaan mission.

For the manned space mission, LVM3 launch vehicle underwent improvements stipulated by the requirements of human rating, it was stated.

(2/2) HS200 rocket booster is the human-rated version of the well-proven S200 rocket booster of GSLV Mk III satellite launch vehicle. This full-duration test of the first stage of the launch vehicle marks a major milestone for the Gaganyaan. pic.twitter.com/zT2t3ACBG8

— ISRO (@isro) May 13, 2022

Accordingly, a host of design improvements aimed at increasing the safety and reliability of various systems were implemented in the S200 booster like all other systems.

These include additional safety features for motor case joints, robust insulation and ignition systems. The control system used in this booster employs one of the world’s most powerful electro-mechanical actuators with multiple redundancies and safety features, ISRO said.

The system is indigenously designed and developed by ISRO in participation with various industries spread across the country.

“Despite the restrictions imposed by the pandemic, ISRO could complete the entire design, development, realisation and testing process within a short span of two years,” the statement said.

The HS200 booster loaded with 203 tonnes of solid propellant was tested for a duration of 135 seconds. The 20-metre long and 3.2 m diameter booster is the world’s second-largest operational booster with solid propellant, it said.

During the test, about 700 parameters were monitored and the performance of all the systems was normal, the space agency further said.

“With the successful completion of this test, ISRO marches one more step closer to Gaganyaan Programme,” it said.

Out of the three propulsion stages of LVM3, the human-rated versions of the second-stage known as L110-G loaded with liquid propellant and the third stage C25-G with cryogenic propellant are in the final phase of qualification, including tests with static firing.

“Gaganyaan programme, the most prestigious scientific endeavour of India, is steadily progressing towards its final goal of taking an Indian to space and bringing him safely back,” ISRO added. PTI

About the Author

The Bengaluru Live

Administrator

View All Posts

Post navigation

Previous: Karnataka govt takes ordinance route to implement “anti-conversion law”
Next: Post SC’s poll diktat, Karnataka CM says BBMP issue ‘pending’ in apex court

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Related Stories

Bengaluru White-Topping Works 51% Complete; GBA Chief Sets December Deadline for NDMF Projects
  • Bengaluru
  • CITY UPDATES

Bengaluru White-Topping Works 51% Complete; GBA Chief Sets December Deadline for NDMF Projects

Satya Prakash Chaubey 24 August 2026
Bengaluru SIR Draft Roll Has 56.99 Lakh Voters; 46.88 Lakh Flagged as ASDD, Claims Open Till September 23
  • Bengaluru
  • CITY UPDATES

Bengaluru SIR Draft Roll Has 56.99 Lakh Voters; 46.88 Lakh Flagged as ASDD, Claims Open Till September 23

Atul Chaturvedi 24 August 2026
Only 20% of Bengaluru Vacant Plot Owners Clean Up; Civic Bodies to Clear Sites and Recover Cost Through Property Tax
  • Bengaluru
  • CITY UPDATES

Only 20% of Bengaluru Vacant Plot Owners Clean Up; Civic Bodies to Clear Sites and Recover Cost Through Property Tax

Satya Prakash Chaubey 24 August 2026

Latest Post

Bengaluru White-Topping Works 51% Complete; GBA Chief Sets December Deadline for NDMF Projects Bengaluru White-Topping Works 51% Complete; GBA Chief Sets December Deadline for NDMF Projects
  • Bengaluru
  • CITY UPDATES

Bengaluru White-Topping Works 51% Complete; GBA Chief Sets December Deadline for NDMF Projects

24 August 2026
Bengaluru SIR Draft Roll Has 56.99 Lakh Voters; 46.88 Lakh Flagged as ASDD, Claims Open Till September 23 Bengaluru SIR Draft Roll Has 56.99 Lakh Voters; 46.88 Lakh Flagged as ASDD, Claims Open Till September 23
  • Bengaluru
  • CITY UPDATES

Bengaluru SIR Draft Roll Has 56.99 Lakh Voters; 46.88 Lakh Flagged as ASDD, Claims Open Till September 23

24 August 2026
Only 20% of Bengaluru Vacant Plot Owners Clean Up; Civic Bodies to Clear Sites and Recover Cost Through Property Tax Only 20% of Bengaluru Vacant Plot Owners Clean Up; Civic Bodies to Clear Sites and Recover Cost Through Property Tax
  • Bengaluru
  • CITY UPDATES

Only 20% of Bengaluru Vacant Plot Owners Clean Up; Civic Bodies to Clear Sites and Recover Cost Through Property Tax

24 August 2026
BJP Leaders Detained During Vidhana Soudha Siege Protest Seeking B Nagendra’s Resignation BJP Leaders Detained During Vidhana Soudha Siege Protest Seeking B Nagendra's Resignation
  • POLITICS

BJP Leaders Detained During Vidhana Soudha Siege Protest Seeking B Nagendra’s Resignation

24 August 2026
Gautam Adani’s Meeting Was a Courtesy Call, First Since I Became CM: D K Shivakumar Gautam Adani's Meeting Was a Courtesy Call, First Since I Became CM: D K Shivakumar
  • Bengaluru

Gautam Adani’s Meeting Was a Courtesy Call, First Since I Became CM: D K Shivakumar

23 August 2026
Hoskote Police Move to Stop 4 AM Biryani Service, Direct Hotels to Open at 6 AM Hoskote Police Move to Stop 4 AM Biryani Service, Direct Hotels to Open at 6 AM
  • Bengaluru
  • CITY UPDATES
  • CRIME

Hoskote Police Move to Stop 4 AM Biryani Service, Direct Hotels to Open at 6 AM

23 August 2026

You may have missed

Bengaluru White-Topping Works 51% Complete; GBA Chief Sets December Deadline for NDMF Projects
  • Bengaluru
  • CITY UPDATES

Bengaluru White-Topping Works 51% Complete; GBA Chief Sets December Deadline for NDMF Projects

Satya Prakash Chaubey 24 August 2026
Bengaluru SIR Draft Roll Has 56.99 Lakh Voters; 46.88 Lakh Flagged as ASDD, Claims Open Till September 23
  • Bengaluru
  • CITY UPDATES

Bengaluru SIR Draft Roll Has 56.99 Lakh Voters; 46.88 Lakh Flagged as ASDD, Claims Open Till September 23

Atul Chaturvedi 24 August 2026
Only 20% of Bengaluru Vacant Plot Owners Clean Up; Civic Bodies to Clear Sites and Recover Cost Through Property Tax
  • Bengaluru
  • CITY UPDATES

Only 20% of Bengaluru Vacant Plot Owners Clean Up; Civic Bodies to Clear Sites and Recover Cost Through Property Tax

Satya Prakash Chaubey 24 August 2026
BJP Leaders Detained During Vidhana Soudha Siege Protest Seeking B Nagendra's Resignation
  • POLITICS

BJP Leaders Detained During Vidhana Soudha Siege Protest Seeking B Nagendra’s Resignation

The Bengaluru Live 24 August 2026

About us

The Bengaluru Live is one of the local digital media house which is publishing news in English and in Kannada language. We are also one of the largest local news providers on the internet through our news websites.

Useful Links

  • Advertise with us
  • Contact us
  • Privacy Policy

Recent News

  • Bengaluru White-Topping Works 51% Complete; GBA Chief Sets December Deadline for NDMF Projects
  • Bengaluru SIR Draft Roll Has 56.99 Lakh Voters; 46.88 Lakh Flagged as ASDD, Claims Open Till September 23
  • Only 20% of Bengaluru Vacant Plot Owners Clean Up; Civic Bodies to Clear Sites and Recover Cost Through Property Tax
  • BJP Leaders Detained During Vidhana Soudha Siege Protest Seeking B Nagendra’s Resignation
©Copyright 2026 The Bengaluru Live All rights reserved. | MoreNews by AF themes.