CM promises master plan for Bengaluru’s drainage system

Date:

Bengaluru’s lakes, main drains will be deepened: Bommai

BENGALURU:

Chief Minister Basavaraj Bommai said a meeting would be convened soon to prepare a master plan to streamline Bengaluru’s drainage system.

He was speaking to reporters on Monday after reviewing the rain-affected areas of HSR Layout, Madivala, Hosur Road and Silk Board Junction.

The Chief Minister said action would be taken to deepen the lakes to enhance their storage capacity. Observing that layouts adjacent to Agara lake were inundated whenever it rained, he said water from around 15-20 lakes situated at a higher level overflows and enters Agara lake. Officials have been instructed to undertake repairs to the main drains and increase their carrying capacity, he said.

Agara layouts’ woes

The CM said he has instructed officials to construct a separate drainage system for layouts around Agara lake within 4-5 months. Action will be taken to separate the sewage and drainage systems, he added.

Noting the level difference in UGDs in the layouts , the CM said instructions have been given to fix the issue. Though the capacity of the Agara STP is 35 mld, it is only treating 25 mld of water at present. The CM said that during the review, it was observed that the treated water was also flowing into the drainage system. The BBMP Chief Commissioner had been instructed to immediately take action to direct the treated water into the lakes, he added.

The Chief Minister said the 4 mld STP adjacent to Madivala lake has not been working and instructions have been given to complete the work within 4-5 months.

Co-ordinate, agencies told

The CM said he has directed BBMP, Bescom and BWSSB to work in tandem.

ಇಲ್ಲಿ ಓದಿ: ಎಚ್‌ಎಸ್‌ಆರ್‌ ಬಡಾವಣೆ ಪ್ರವಾಹ ಪೀಡಿತ ಪ್ರದೇಶಗಳಿಗೆ ಸಿಎಂ ಭೇಟಿ

Pothole work after rains

Bommai said information regarding the situation of potholes in the city is being gathered and a separate meeting would be convened to resolve the matter. Repair work could not be started due to incessant rains. As soon as the rains stop, repair work would be taken up on a war footing, he added.

Satish Reddy, MLA, Gaurav Gupta, Chief Commissioner, BBMP, and Rakesh Singh Administrator, BBMP, were present.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Share post:

Subscribe

spot_imgspot_img

Popular

More like this
Related

Karnataka Minister Warns NEET Aspirants Against Fraudsters, Vows Strict Action

KEA to Handle All Medical Seat Allotments Through Transparent...

Karnataka CM Assures Safe Return of Kannadigas from War-Hit Regions

Bengaluru: Karnataka Chief Minister Siddaramaiah on Tuesday assured that...

Bengaluru Stampede: Karnataka HC Questions Sealed Cover Status Report, Calls for Transparency

A bench of Acting Chief Justice V Kameswar Rao and Justice CM Joshi, hearing a suo motu PIL, was told by Advocate General Shashi Kiran Shetty that the government was not avoiding disclosure but wanted to prevent sensationalism of preliminary findings. The court, however, appeared unconvinced, noting that it would appoint an amicus curiae to assess the appropriateness of sealed submissions.

ED Summons Congress Leader D K Suresh in Aishwarya Gowda Money Laundering Case

Suresh to Appear on June 19; Woman Accused of...
bengaluru {"prefetch":[{"source":"document","where":{"and":[{"href_matches":"\/*"},{"not":{"href_matches":["\/wp-*.php","\/wp-admin\/*","\/wp-content\/uploads\/*","\/wp-content\/*","\/wp-content\/plugins\/*","\/wp-content\/themes\/thebengalurulive\/*","\/*\\?(.+)"]}},{"not":{"selector_matches":"a[rel~=\"nofollow\"]"}},{"not":{"selector_matches":".no-prefetch, .no-prefetch a"}}]},"eagerness":"conservative"}]}