Skip to content
The Bengaluru Live | Bengaluru News, Breaking Updates

The Bengaluru Live | Bengaluru News, Breaking Updates

Bengaluru’s Leading News Portal

bmc-ad
Primary Menu
  • HOME
  • Bengaluru
  • Karnataka
  • POLITICS
  • CRIME
  • Delhi
  • Kannada News
  • Hindi News
  • MORE NEWS
    • Supreme Court
    • CITY UPDATES
    • PM
    • SPORTS
    • STATE
    • EDUCATION
    • ENTERTAINMENT
    • HEALTH
    • Real Estate
    • SPORTS
    • CORONA
    • MOBILITY/TRANSPORT
    • Horoscope
  • Home
  • CITY UPDATES
  • India to boost power generation, transmission infra to achieve 24X7 power for all in 2025
  • CITY UPDATES
  • STATE

India to boost power generation, transmission infra to achieve 24X7 power for all in 2025

29 December 2024 5 minutes read
0
📘 Read this story in Kannada

New Delhi Dec 29 (PTI) India will set up more coal-fired and hydro-power plants and ramp up transmission infrastructure to achieve round-the-clock ‘Power for All’ in 2025, besides meeting rising demand fueled by economic expansion.

To meet the growing energy demand, the government has devised a major plan for power generation capacity addition and the expansion of transmission infrastructure.

According to Minister of State for Power Shripad Yesso Naik, India can definitely achieve ‘24×7’ power for all with all the efforts in the ministry under the leadership of Prime Minister Narendra Modi. “We can do it. In 2025, we will be almost there to have 24X7 power for all in the country,” Naik told PTI.

He also said that the government is ready to support the expansion plan of the power sector in view of rising demand.

According to government estimates, peak power demand is expected to touch 270 GW in the summer season in 2025, up from the record high of 250 GW in May 2024 and 243 GW in September 2023. The peak power demand is estimated to reach a level of 446 GW by 2035.

The Ministry of Power along with states, has planned about 80 GW by 2031-32. Besides about 14 GW of hydro projects and 6,050 MW Pumped Storage Projects (PSP) are under construction. About 24.22 GW of hydroelectric projects and 50.76GW MW of PSP are under various stages of planning and are targeted to be completed by 2031-32.

About 7,300 MW of Nuclear Capacity is under construction and 7,000 MW is under various stages of planning and approval.

Besides, the government will also add about 300 GW of renewable energy capacity to have 500 GW of non-fossil fuel-based power generation by 2030.

To evacuate electricity from the additional power generation capacity, the government has planned an investment of Rs 9.16 lakh crore to ramp up transmission infrastructure by 2032 to meet the rising demand for electricity.

Chairman, CII National Power Committee, and Managing Director, Adani Energy Solutions Anil Sardana said, “With significant strides in renewable energy integration, grid modernisation, and an unwavering commitment to carbon reduction, the sector has taken a giant leap towards meeting both domestic and global energy demands.” “As we look towards 2025, India’s ambitious goal to expand its transmission infrastructure and achieve non-fossil capacity targets of 500 GW and about 800 GW of aggregate supply capacity by 2030 presents both a significant challenge and an opportunity.” “While we face the task of balancing energy demand with sustainable growth, the expansion of our transmission grid will unlock new possibilities for efficient power distribution, driving economic growth and enhancing the nation’s energy resilience,” he said.

Vikram V, Vice President & Co-Group Head – Corporate Ratings, ICRA said that the power sector witnessed healthy growth in capacity addition in the renewable energy sector in 2024 with 25 GW added in the first 11 months of CY2024 (calendar year) driven by the large project pipeline and favourable module pricing.

The bidding activity remained healthy leading to a healthy pipeline for future addition, he said adding that however, delays in signing the PPAs / PSAs (power purchase agreements) by the central bidding agencies remains a concern for the sector.

Apart from the utility segment, the rooftop solar segment and the commercial & industrial (C&I) segment are expected to contribute in a significant manner to the capacity addition, he stated.

Further, he pointed out that the execution challenges remain an area of concern for the sector, with respect to delays in land acquisition and transmission connectivity, which if sustained could hamper the capacity addition prospects.

While the sector is likely to face connectivity challenges in the near term, the ongoing progress in the various transmission projects is expected to ease the connectivity challenges for the sector over the medium term.

The electricity demand growth slowed down post-August 2024 amid the adverse impact of heavy rains across the country and a slowdown in economic activity in Q2 FY2025, he noted.

Nonetheless, he stated that the demand growth is expected to recover in the remaining period of the fiscal year.

While the policy focus remains on renewables, the electricity generation remains dominated by coal-based power, he pointed out.

While this share is expected to reduce over the medium term, there are new coal power project announcements of 27 GW with expected completion by 2032 to meet the growing demand, he opined.

Salil Gupta, Chair, Power Committee, PHDCCI suggested that reforms are required to reduce financial stress on trading companies.

About Open Access, Gupta said, “Massive gap between centre and state thought process. On ground, open access is still very discouraged including Green Open Access.

“Unreliability on regulations changing even after setting up of 25 years projects create a massive hindrance on more and more industries going and investing themselves in RE projects and instead going for Group Captive model which results in further complications and legal disputes.” He suggested that regulations/policies should provide confidence to the stakeholders.

On the price gap between RE and thermal power, he stated that high volatility between Time of Day market rates due to high volume of solar during the day and reliance on thermal in the evening and night hours creates an unsustainable gap in the prices. PTI KKS MR MR

About the Author

View All Posts

Post navigation

Previous: Govt cancels auction of 11 critical mineral blocks
Next: Assam: Drugs worth Rs 15 crore seized; two held

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Related Stories

Minister Krishna Byre Gowda Honours GBA Officials Assaulted During Shivajinagar Footpath Encroachment Drive
  • Bengaluru
  • CITY UPDATES

Minister Krishna Byre Gowda Honours GBA Officials Assaulted During Shivajinagar Footpath Encroachment Drive

Satya Prakash Chaubey 24 July 2026
Minister Yathindra Siddaramaiah Reviews KUWSDB Projects, Orders Survey of All STP Units in Karnataka
  • Government
  • Karnataka
  • STATE

Minister Yathindra Siddaramaiah Reviews KUWSDB Projects, Orders Survey of All STP Units in Karnataka

Satya Prakash Chaubey 24 July 2026
Exclusive: 'Pile Foundation Advice Was Ignored,' Says Nagadi Consultants; Rejects SNN Raj Corp's Allegation on 18-Storey Tower
  • Bengaluru
  • CITY UPDATES

Exclusive: ‘Pile Foundation Advice Was Ignored,’ Says Nagadi Consultants; Rejects SNN Raj Corp’s Allegation on 18-Storey Tower

Atul Chaturvedi 24 July 2026

Latest Post

Minister Krishna Byre Gowda Honours GBA Officials Assaulted During Shivajinagar Footpath Encroachment Drive Minister Krishna Byre Gowda Honours GBA Officials Assaulted During Shivajinagar Footpath Encroachment Drive
  • Bengaluru
  • CITY UPDATES

Minister Krishna Byre Gowda Honours GBA Officials Assaulted During Shivajinagar Footpath Encroachment Drive

24 July 2026
Karnataka to Revive Government Flying Training School at Jakkur, Says DCM G. Parameshwara Karnataka to Revive Government Flying Training School at Jakkur, Says DCM G. Parameshwara
  • Government
  • Bengaluru

Karnataka to Revive Government Flying Training School at Jakkur, Says DCM G. Parameshwara

24 July 2026
Geologists to Get District Targets as Karnataka Aims for ₹11,000 Crore Mining Revenue: Rohini Sindhuri Geologists to Get District Targets as Karnataka Aims for ₹11,000 Crore Mining Revenue: Rohini Sindhuri
  • Bengaluru
  • Government

Geologists to Get District Targets as Karnataka Aims for ₹11,000 Crore Mining Revenue: Rohini Sindhuri

24 July 2026
KJ George Warns of Strict Action Against Self-Execution Power Projects Violating KERC Norms KJ George Warns of Strict Action Against Self-Execution Power Projects Violating KERC Norms
  • Government
  • Bengaluru

KJ George Warns of Strict Action Against Self-Execution Power Projects Violating KERC Norms

24 July 2026
Minister Yathindra Siddaramaiah Reviews KUWSDB Projects, Orders Survey of All STP Units in Karnataka Minister Yathindra Siddaramaiah Reviews KUWSDB Projects, Orders Survey of All STP Units in Karnataka
  • Government
  • Karnataka
  • STATE

Minister Yathindra Siddaramaiah Reviews KUWSDB Projects, Orders Survey of All STP Units in Karnataka

24 July 2026
Exclusive: ‘Pile Foundation Advice Was Ignored,’ Says Nagadi Consultants; Rejects SNN Raj Corp’s Allegation on 18-Storey Tower Exclusive: 'Pile Foundation Advice Was Ignored,' Says Nagadi Consultants; Rejects SNN Raj Corp's Allegation on 18-Storey Tower
  • Bengaluru
  • CITY UPDATES

Exclusive: ‘Pile Foundation Advice Was Ignored,’ Says Nagadi Consultants; Rejects SNN Raj Corp’s Allegation on 18-Storey Tower

24 July 2026

You may have missed

Minister Krishna Byre Gowda Honours GBA Officials Assaulted During Shivajinagar Footpath Encroachment Drive
  • Bengaluru
  • CITY UPDATES

Minister Krishna Byre Gowda Honours GBA Officials Assaulted During Shivajinagar Footpath Encroachment Drive

Satya Prakash Chaubey 24 July 2026
Karnataka to Revive Government Flying Training School at Jakkur, Says DCM G. Parameshwara
  • Government
  • Bengaluru

Karnataka to Revive Government Flying Training School at Jakkur, Says DCM G. Parameshwara

The Bengaluru Live 24 July 2026
Geologists to Get District Targets as Karnataka Aims for ₹11,000 Crore Mining Revenue: Rohini Sindhuri
  • Bengaluru
  • Government

Geologists to Get District Targets as Karnataka Aims for ₹11,000 Crore Mining Revenue: Rohini Sindhuri

The Bengaluru Live 24 July 2026
KJ George Warns of Strict Action Against Self-Execution Power Projects Violating KERC Norms
  • Government
  • Bengaluru

KJ George Warns of Strict Action Against Self-Execution Power Projects Violating KERC Norms

The Bengaluru Live 24 July 2026

About us

The Bengaluru Live is one of the local digital media house which is publishing news in English and in Kannada language. We are also one of the largest local news providers on the internet through our news websites.

Useful Links

  • Advertise with us
  • Contact us
  • Privacy Policy

Recent News

  • Minister Krishna Byre Gowda Honours GBA Officials Assaulted During Shivajinagar Footpath Encroachment Drive
  • Karnataka to Revive Government Flying Training School at Jakkur, Says DCM G. Parameshwara
  • Geologists to Get District Targets as Karnataka Aims for ₹11,000 Crore Mining Revenue: Rohini Sindhuri
  • KJ George Warns of Strict Action Against Self-Execution Power Projects Violating KERC Norms
©Copyright 2026 The Bengaluru Live All rights reserved. | MoreNews by AF themes.