Bengaluru Central City Corporation officials during the inspection on Sunday. Image: Bengaluru Central City Corporation
Bengaluru: Bengaluru Central City Corporation’s Additional Commissioner (Development) Venkatachalapathi on Sunday inspected Banappa Park, Mysore Bank Circle, areas in the Chamarajpet division and the Okalipuram eight-lane corridor work sites to review the Ward One campaign, cleanliness, footpath repairs, public infrastructure and the progress of development works, according to a press release issued on November 22.
He directed officials to complete pending works quickly so that the public gets safe and smooth movement, a clean environment and better civic amenities, and to leave no lapses in maintenance.
At Banappa Park on KR Road, he asked officials to keep the park clean and well maintained, provide the facilities the public needs to spend time there comfortably, keep public toilets clean and give priority to park maintenance. He then walked from the park to Mysore Bank Circle and directed that damaged footpaths be repaired quickly and waste collected by the roadside be cleared immediately.
He said suitable signboards, including ‘No urination’ and ‘No dumping of garbage’, should be installed where needed, and dangerous or damaged signboards removed. He also told officials to clear completely the construction debris and waste dumped around trees.
At the Ward One campaign sites in the Chamarajpet division, he told officials to take care that footpaths are not damaged while clearing roadside soil and waste. He reviewed the steps already taken to widen Hosahalli Main Road over about 1.8 km and directed that the next steps be expedited. Road widening and development works should be carried out in a people-friendly manner, giving priority to public safety and convenience, he said.
He also visited two four-storey school and college buildings of the Corporation being built at Rayapura and JJR Nagar in the Chamarajpet division under the Amruta Nagarotthana and Chief Minister’s Infrastructure Development Programme (CMIDP) grants. After going through every room of the buildings and checking the progress and quality of work, he said the safety of workers and the public should get high priority during construction, and directed officials to complete the works at the prescribed quality without any lapses.
At the Corporation school in Goripalya, he interacted with schoolchildren and asked about the facilities they receive, including uniforms, textbooks, meals and other infrastructure. He directed officials to provide a good learning environment and the necessary facilities properly.
At the Okalipuram eight-lane corridor road work site, in the Gandhinagar division, he directed that the works already under way be speeded up. Stones near the retaining wall construction should be cleared and the pipe-pushing work for the stormwater drain completed quickly, he said. If possible, work should be started on both sides at the same time so that the whole project is completed as early as possible.
Chief Engineer Vijay Kumar Haridas, Executive Engineers Javed, Bhaskar Reddy and Pradeep, assistant executive engineers and other officials were present.
