BENGALURU:
Union minister for National Highways and Road Transport Nitin Gadkari has approved the Rs1200cr project to upgrade the existing 2-lane Shiradi Ghat road into 4-lane highway.
The National Highways Authority of India would take up the project and complete it in 2 years, Gadkari said.
Thank you @nitin_gadkari ji for approving the upgradation of the 2 lane road at Shiradi Ghat to 4 lanes at a cost of Rs 1200 crore.
— Basavaraj S Bommai (@BSBommai) January 20, 2022
We have assured all our support to the same and look forward to the completion of this road,
1/2@narendramodi @PMOIndia @CMofKarnataka
Chief Minister Basavaraj Bommai has assured full cooperation and speedy approvals for implementing the project.
Shiradi ghat road needs immediate upgradation. The road usually is in pitiable condition during the monsoon season and unmotorable. So the union government has cleared the proposal to upgrade it into a 4-lane highway.
ಇದನ್ನೂ ಓದಿ: 1200 ಕೋಟಿ ರೂ.ಗಳ ವೆಚ್ಚದಲ್ಲಿ ಶಿರಾಡಿ ಘಾಟ್ ನ್ನು ಚತುಷ್ಪಥ ರಸ್ತೆಯಾಗಿ ಮೇಲ್ದರ್ಜೆಗೇರಿಸಲು ಕೇಂದ್ರ ಸಚಿವರ ಅನುಮೋದನೆ
With the upgradation the entire stretch of highway between Bengaluru and Mangaluru would become a 4-lane road. The 4-laning of national highway 75 will accelerate the economic growth of the region.
The union minister has instructed the NHAI to study the proposal to build a 6-lane tunnel through the Shiradi ghat.