Toyota Kirloskar commences third shift at Karnataka-based plant to enhance production, cut waiting period

Date:

NEW DELHI:

Toyota Kirloskar Motor has initiated a third shift at its Karnataka-based plant to enhance production capacity by around 30 per cent, as it looks to cut down waiting periods on some of its popular models like Innova Crysta and Fortuner.

The automaker has commenced a third shift from the first week of May in its Plant 1 in Bidadi on the outskirts of Bengaluru to ramp up the manufacturing capacity.

The company has invested over Rs 90 crore to upgrade the existing infrastructure at the facility and added around 1,500 workforce for the third shift at the plant.

”We have commenced a third shift at the plant which produces models like Innova Crysta, Innova Hycross and Fortuner. These products have been quite successful and there is quite a long waiting period. We are trying to minimise the impact for the customers,” TKM Senior Vice President and Chief Communication Officer Sudeep S Dalvi told PTI in an interaction.

He noted that the company took a shutdown of around a week at the plant to modify certain areas to enable the third shift.

”We have invested more than Rs 900 million in the plant capacity expansion,” Dalvi stated.

Also Read: Toyota Kirloskar sales dip 6 pc in Apr to 14,162 units

The third shift would allow the plant to produce 30 per cent more, as compared to what it is producing right now, he added.

TKM is looking to produce over 30,000 units a year from the plant which currently rolls out close to 1 lakh units per annum.

The automaker has two facilities within the Bidadi compound which rolls out different sets of products.

TKM’s Plant 1 commenced production in December 1999 and currently rolls out Innova Hycross, Innova Crysta, Fortuner and Legender.

Products like Camry Hybrid and Hilux are also assembled at the Bidadi facility.

TKM currently has a total production capacity of 3.10 lakh units per annum at the Bidadi plant.

Dalvi noted that operations at its second plant, which rolls out products like Hyryder and Grand Vitara, are not part of the current capacity enhancement initiative.

In April, TKM decided to temporarily halt bookings of top trims of its multi purpose vehicle Innova Hycross from April 8, owing to ongoing supply challenges.

Last year it had also stopped taking orders for the diesel variant of Innova Crysta due to high demand and increased waiting period.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Share post:

Subscribe

spot_imgspot_img

Popular

More like this
Related

Karnataka: No Vacancy for CM Post, No Leadership Change, Says KJ George

Bengaluru: Energy Minister K.J. George on Tuesday dismissed ongoing...

Karnataka: Government Offices May Soon Get Prepaid Electricity Meters: K.J. George Says Cabinet Will Decide

Bengaluru: The Karnataka government is considering the installation of...

Plan to Provide Drinking Water to 2 Crore Bengalureans: DyCM D.K. Shivakumar Receives Guinness Certificate for Water Pledge Campaign

He revealed that BWSSB, under the leadership of Chairman Dr. Ram Prasath Manohar, is drafting innovative strategies to cater to the growing needs of the city, including newly added 110 villages in the Greater Bengaluru region. Shivakumar added that the state government is discussing the possibility of expanding BBMP’s jurisdiction and forming new municipalities under Greater Bengaluru.

BBMP Executive Engineer Yerappa Reddy Caught Red-Handed Taking ₹10 Lakh Bribe in Lokayukta Trap Operation

The accused, H.V. Yerappa Reddy, serving as the Executive Engineer of C.V. Raman Nagar Division, Bruhat Bengaluru Mahanagara Palike (BBMP), was caught red-handed during a trap laid by the Lokayukta police based on a complaint filed by Hemant G.M., a contractor.
bengaluru {"prefetch":[{"source":"document","where":{"and":[{"href_matches":"\/*"},{"not":{"href_matches":["\/wp-*.php","\/wp-admin\/*","\/wp-content\/uploads\/*","\/wp-content\/*","\/wp-content\/plugins\/*","\/wp-content\/themes\/thebengalurulive\/*","\/*\\?(.+)"]}},{"not":{"selector_matches":"a[rel~=\"nofollow\"]"}},{"not":{"selector_matches":".no-prefetch, .no-prefetch a"}}]},"eagerness":"conservative"}]}